top of page
PROJECT MANAGEMENT 
PROJECT 1 : Defining and Documenting a Project

Project 1 of the module allow us to work in a team of 6 with different role in a project team and i was being a civil engineer. Through simulating actual meeting and producing minutes at the same time making progress of an imaginary project that is specified by the lecturer who is acting as the client. We produce a report at the end of the day with satisfying amount of information and outcome ranging from costing estimation, architecture drawings, engineer's details, M&E details, landscaping specification and project directions listed within the report.

 

Attached below is the pdf file of the produced report:

PROJECT 2 : Documenting of Medium-size Project

         

 

 

Project 2 is an individual project that require us to document out own Architecture Design Project's final project. Also role playing as a project manager, we need to plan out the whole thing for the project such as brief, stakeholder, risk management, how to maintain the project and programme. Then determine and set directions and team goals which allow the team to carry out their task efficiently. And also producing Workbreakdown structure and Gantt chart to ease monitoring of projects.

 

Attached below are the pdf files of the produced report:

Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
A3 last
Ooi Kai Yang
0315663

© 2023 by Designs by Thomas Rider.

  • facebook-square
  • Twitter Square
  • google-plus-square

Your details were sent successfully!

bottom of page